International Journal of Science and Research (IJSR)

International Journal of Science and Research (IJSR)
Call for Papers | Fully Refereed | Open Access | Double Blind Peer Reviewed

ISSN: 2319-7064

Downloads: 66 | Views: 174

Research Paper | Industrial Engineering | United States of America | Volume 4 Issue 11, November 2015 | Rating: 6.4 / 10


Stakeholders Requirements Assessment for Biofuel Production

Mostafa F. Fawzy Ph.D. | Paul J. Componation Ph.D. | Guiping Hu Ph.D.


Abstract: Biofuel is one of the best alternatives for fossil fuel in the United States. Fast pyrolysis as one of the most promises thermochemical based advanced biofuel production techniques has been brought to the forefront of industry. With limited information about the manufacturing of fast pyrolysis units, a better understanding of stakeholders' requirements is timely and necessary. This study develops a comprehensive analysis of stakeholders' requirements. Individual experts were asked to rank, review, and evaluate a set of requirements for a unity of fast pyrolysis unit sizes. The requirements with their evaluation were then used to determine the most effective unit size. The analysis showed that the smallest unit size (process an average of 50 tons per day) is the best alternative based on 50% of the high-prioritized requirements. However, 37.5% of the high-prioritized requirements recommended the unit which process at least 2000 tons per day as the best alternative.


Keywords: Decision-making, Biofuel, Pyrolysis, Fast pyrolysis unit


Edition: Volume 4 Issue 11, November 2015,


Pages: 2439 - 2449

Rate this Article


Select Rating (Lowest: 1, Highest: 10)

5

Your Comments

Characters: 0


Type Your Registered Email Address below to Rate the Article


Verification Code will appear in 2 Seconds ... Wait

Top