International Journal of Science and Research (IJSR)

International Journal of Science and Research (IJSR)
Call for Papers | Fully Refereed | Open Access | Double Blind Peer Reviewed

ISSN: 2319-7064

Downloads: 0 | Views: 96

Informative Article | Information Technology | India | Volume 10 Issue 11, November 2021 | Rating: 4.1 / 10


Pre-Draw-Parts Management

Subhani Shaik [3]


Abstract: Pre - draw in aviation refers to the strategic process of forecasting, reserving, and allocating aircraft parts, components, or materials in advance of maintenance, repair, or overhaul (MRO) activities. This proactive approach aims to optimize inventory management, reduce lead times, and ensure the availability of critical resources to support uninterrupted flight operations. Key terminologies associated with pre - draw include forecasting, reservation, allocation, lead time, safety stock, and inventory turnover. By leveraging advanced demand planning, collaboration with suppliers, and sophisticated inventory management systems, aviation organizations can enhance operational efficiency, minimize downtime, and improve overall reliability. This abstract provides an overview of the concepts and strategies involved in pre - draw in aviation, highlighting its importance in maintaining a robust and responsive supply chain to meet the dynamic needs of the aviation industry.


Keywords: aviation, forecasting, reserving, aircraft


Edition: Volume 10 Issue 11, November 2021,


Pages: 1526 - 1527

Rate this Article


Select Rating (Lowest: 1, Highest: 10)

5

Your Comments

Characters: 0


Type Your Registered Email Address below to Rate the Article


Verification Code will appear in 2 Seconds ... Wait

Top