Downloads: 137
M.Tech / M.E / PhD Thesis | Civil Engineering | Bahrain | Volume 7 Issue 3, March 2018
Late Payments for Contractors Working for Bahrain Government Building Construction Projects: Part I (Factors and Consequences of Late Payment)
Sahar K. A. Falamarzi [2] | Saad M. A. Suliman [2]
Abstract: The problem of late payment is considered one of the major issues in the construction industry, it is an important issue faced by many countries including Kingdom of Bahrain, and it has many consequences on building construction projects. The main objectives of this research are to identify the factors, consequences of delay in payment and their importance, and to determine solutions to overcome this issue. The main factors, consequences and solutions of payment delay were identified through a questionnaire collected from (104) respondents working in building construction engineering field in both governmental and private sectors. Thereafter, the questionnaire results were analyzed, and the highest ranked factors were identified, and solutions to overcome their consequences were recommended.
Keywords: Interim payment delay, Variation payment delay, Payment delay, Ministry of Works MoW
Edition: Volume 7 Issue 3, March 2018,
Pages: 688 - 699
Similar Articles with Keyword 'payment'
Downloads: 111 | Weekly Hits: ⮙1 | Monthly Hits: ⮙1
Research Paper, Civil Engineering, Indonesia, Volume 5 Issue 8, August 2016
Pages: 1928 - 1938Study of Infrastructure Financing with the Using Wealth Alms In The Province of South Sulawesi (Case Study Road Development Mustafa Dg. Bunga - Muttalib Dg. Narang South Sulawesi Province)
Mursalim [4] | Sakti Adji Adisasmita [2] | Rusdi Usman Latif | Suharman Hamzah
Downloads: 124
Research Paper, Civil Engineering, Indonesia, Volume 8 Issue 12, December 2019
Pages: 608 - 613Performance Analysis of Implementation of Construction Projects with Customer Satisfaction Index (CSI) in Building Projects
Tutang Muhtar Kamaluddin | Armin Basong | Jesica Margaretha Sane