Downloads: 108 | Views: 297
Research Paper | Engineering Science | Iraq | Volume 6 Issue 3, March 2017 | Popularity: 6.9 / 10
Reality Analysis of Materials Management Practices for the Construction Projects in Iraq
Dr. Angham E. Ali Al-Saffar, Surra T. Yass AL-Qaicy
Abstract: The aim of this paper is to provide a clear understanding about the extent of the application and the weaknesses of the most important practices in the materials management that observed in Iraqi construction sector. The field survey included, sample selection, questionnaire preparation, data collecting, presentation, analysis, and results evaluation. The questionnaire included eight processes represent construction materials management processes, and each process in turn includes several axes. The research has diagnosed a general weakness in all construction materials management processes, especially in the waste treatment, feedback and handling processes where the degree of application (Conformance Ratio Cr) was 46 %, 51 %, and 55 % respectively. While the degree of application of the remaining processes was planning 0.64, purchasing 0.7, transferring 0.62, receiving 0.71, storage0.67 respectively. Finally the degree of application of construction materials management was 0.63 which refers to (Middle) degree of evaluation.
Keywords: Materials Management, Construction Projects, Most Important Practices
Edition: Volume 6 Issue 3, March 2017
Pages: 1813 - 1819
Make Sure to Disable the Pop-Up Blocker of Web Browser
Similar Articles
Downloads: 101
Research Paper, Engineering Science, Iraq, Volume 6 Issue 3, March 2017
Pages: 1806 - 1812Evaluation Planning and Scheduling of Repetitive Construction Projects in Iraq
Noor A. Abdul-Jabbar AL-SODANI, Hatem K. B. Alajeeli
Downloads: 102
Research Paper, Engineering Science, Iraq, Volume 6 Issue 3, March 2017
Pages: 1788 - 1792Evaluation of the Current Situation to Application of Building Information Modeling in Iraq
Ayad A. Obaid AL-SHIBLAWI, Kadhim R. Erzaij