An Assessment of the Factors Causing Delays on Residential Construction Projects in Pune

Sneha K. Pawar, S. S.Ambure


Abstract: Residential building construction projects in Pune construction industry are experiencing a wide spread of delays. The purpose of this study was to assess the factors causing delays and their effects on building construction projects in Pune. Thirty Two (32) project delay attributes were identified through detailed literature review. Structured interviews and questionnaire survey were conducted across stakeholders. This research categorized the causes of delay under three main groups of consultant related, contractor related and client related. The RII technique for all delay factors and group of categories was computed so as to rank the factors. The most significant factors of construction delays were identified as (1) Shortage of materials, (2) Obtaining permit from municipality, (3) Late deliveries of materials, (4) Legal disputes, (5) Shortage of skilled labors. The study concluded that contractor related category had the highest impact (RII 0.96), followed by consultant related (RII = 0.94), then client related (RII = 0.93). Identification of the causes of potential delay factors that are likely to affect the timely delivery of projects can help to avoid extra costs through claims and disputes that arise among parties when delays are experienced.


Keywords: Delays, Relative Importance Index RII, effects of delays


Edition: Volume 6 Issue 6, June 2017


Pages: 2319 - 2323



Make Sure to Disable the Pop-Up Blocker of Web Browser




Text copied to Clipboard!
Sneha K. Pawar, S. S.Ambure, "An Assessment of the Factors Causing Delays on Residential Construction Projects in Pune", International Journal of Science and Research (IJSR), Volume 6 Issue 6, June 2017, pp. 2319-2323, https://www.ijsr.net/getabstract.php?paperid=ART20174826, DOI: https://www.doi.org/10.21275/ART20174826



Similar Articles

Downloads: 124

M.Tech / M.E / PhD Thesis, Civil Engineering, India, Volume 4 Issue 8, August 2015

Pages: 1027 - 1035

Efficient Contractor Selection and Bid Evaluation Methods for Construction Industry in India

Dwarika Puri, Dr. Sanjay Tiwari

Share this Article

Downloads: 125

Research Paper, Civil Engineering, India, Volume 4 Issue 5, May 2015

Pages: 1585 - 1588

Identifying Factors Affecting Construction Labour Productivity in Amravati

Anurag Sangole, Amit Ranit

Share this Article

Downloads: 125

Research Paper, Civil Engineering, India, Volume 5 Issue 5, May 2016

Pages: 2358 - 2362

Monitoring and Controlling RCC Work in Construction Project

Nimesh Gujarati, Dr. B S Balapgol

Share this Article

Downloads: 139

M.Tech / M.E / PhD Thesis, Civil Engineering, India, Volume 5 Issue 1, January 2016

Pages: 59 - 61

Causes of Delays in any Construction Project

Naikwadi Sumaiyya R., Khare Pranay R.

Share this Article

Downloads: 140

Research Paper, Civil Engineering, India, Volume 5 Issue 3, March 2016

Pages: 334 - 336

Study of Factors Influencing Cost Overruns: An Overview

Abhimanyu S. Rathi, Pravin V.Khandve

Share this Article



Top