Material Constrained Scheduling in Construction Project

M. P. Venkatesh, Saravana Natarajan P.S


Abstract: The effective construction project requires proper conceptual planning, execution and finishing of projects in a stipulated duration and committed cost. Most of the construction projects were completed with overrun cost and in extended time due to various reasons, especially due to improper allocation of resources which is found to be most critical. The overrun duration can be avoided by crashing the project schedule with considering the site related problems. By crashing the project schedule we may avoid the project over head cost occurring to the project. The method of study is analyzing the housing Project with respect to material related constraint and reducing the project duration and over head cost.


Keywords: Repetitive Construction Projects, Project Scheduling, Resource Allocation


Edition: Volume 7 Issue 10, October 2018


Pages: 515 - 519



Make Sure to Disable the Pop-Up Blocker of Web Browser




Text copied to Clipboard!
M. P. Venkatesh, Saravana Natarajan P.S, "Material Constrained Scheduling in Construction Project", International Journal of Science and Research (IJSR), Volume 7 Issue 10, October 2018, pp. 515-519, https://www.ijsr.net/getabstract.php?paperid=ART20191886, DOI: https://www.doi.org/10.21275/ART20191886



Similar Articles

Downloads: 0

Student Project, Civil Engineering, India, Volume 12 Issue 4, April 2023

Pages: 1579 - 1580

Cost and Time Saving Building Construction Using RC CAD Software

Rushabh Ranjeet Patil

Share this Article

Downloads: 134

Research Paper, Civil Engineering, India, Volume 6 Issue 3, March 2017

Pages: 658 - 662

Work Breakdown Structure Scheduling for Repetitive Construction Projects with Soft Logics

Lekshmi A L, Dr. T R Sethu Raman, Sreeja V

Share this Article
Top