International Journal of Science and Research (IJSR)

International Journal of Science and Research (IJSR)
Call for Papers | Fully Refereed | Open Access | Double Blind Peer Reviewed

ISSN: 2319-7064


Downloads: 184 | Views: 413

Research Paper | Civil Engineering | Indonesia | Volume 7 Issue 12, December 2018 | Popularity: 6.9 / 10


     

Risk Management Maturity Safety and Health Management System (SMK3) Contractor-Case Study: Toll Road Project Bogor-Ciawi-Sukabumi

Susilawati, Dr. Ir. Fitri Suryani MT, Dr. Ir. Dwi Dinariana MT


Abstract: Strategic plans to improve the application of occupational safety and health (SMK3) in general in Indonesia are still often overlooked. This is indicated by the still high number of work accidents on the implementation of toll roads by contractors in Indonesia. Risk Management Maturity is a method used to measure the maturity level of the application of risk management in one organization by identifying steps, types of work that need to be completed, and the sequence of activities that need to be implemented and have meaningful and measurable results. The purpose of this study is to determine the extent of the risk management of maturity / maturity, occupational safety and health in the Bogor-Ciawi-Sukabumi toll road project. This study uses a comparative analysis of Analytical Hierarchy Process (AHP) to get the results of the high risk category in the risk of applying an occupational health and safety management system, while the criteria assessment uses the Enterprise Risk Maturity. The results of this study indicate that the level of maturity at level 3 means that this study recommends that this level be improved so that it can encourage the implementation of occupational health and safety to be carried out thoroughly and applied to the current and future Bogor-Ciawi-Sukabumi toll road projects.


Keywords: Risk Management Maturity SMK3, Contractors


Edition: Volume 7 Issue 12, December 2018


Pages: 417 - 422



Make Sure to Disable the Pop-Up Blocker of Web Browser




Text copied to Clipboard!
Susilawati, Dr. Ir. Fitri Suryani MT, Dr. Ir. Dwi Dinariana MT, "Risk Management Maturity Safety and Health Management System (SMK3) Contractor-Case Study: Toll Road Project Bogor-Ciawi-Sukabumi", International Journal of Science and Research (IJSR), Volume 7 Issue 12, December 2018, pp. 417-422, URL: https://www.ijsr.net/getabstract.php?paperid=ART20193440, DOI: https://www.doi.org/10.21275/ART20193440



Top