Effective Resource Utilization for Successful Completion of a Project in Nepal
Sudesh K.C., S. Priscil Nidhu
Abstract: Construction projects require planning, scheduling and resource management for successful completion of a project. Improper planning, poor estimation and unclear contracts regarding the procurement of resources cause cost and time overrun in activities of a project. So, a resource must be planned with proper estimation, clear contract and smooth utilization of resource constraints. The present study deals with the resource management of two projects namely Khudi Hydropower Repair Project and K. C. Bhawan Semi-Commercial Building Project in Nepal. The study for this project has been carried out in two stages. At first all the activities were planned and scheduled in Microsoft Project then the resources for each activity were planned and estimated using MS Excel in the second stage. The prices attributed for the Commercial Building was adopted using the Standards prevailing in the market and for the repair of hydropower project, prices are adopted according to the BOQ as agreed between the client and contractor. The study of this paper relates to two prevailing contracts in the market where one contract gives the authority of managing the resources by the contractor itself while the other contract gives the authority of managing resources by the client. The required data has been collected from drawings and prevailing site conditions which has shown that contracts giving authority of managing resources to the contractor is more cost effective than the contracts where resources are procured by the client itself. The study of this paper also concludes that material price forecasting is required as the contractor suffered a loss in the fourth floor of the building. The material price attributed to the fourth floor was taken by taking the average of the material prices of the previous five years.
Keywords: Microsoft Project, MS Excel, Resource Constraints
Edition: Volume 8 Issue 4, April 2019
Pages: 496 - 499
Make Sure to Disable the Pop-Up Blocker of Web Browser
Similar Articles
Downloads: 8 | Weekly Hits: ⮙1 | Monthly Hits: ⮙1
Case Studies, Civil Engineering, India, Volume 11 Issue 4, April 2022
Pages: 1187 - 1197A Case Study on Planning and Scheduling of a Project PIPLMC of a Package - 6A using Microsoft Project 2016
Kota Sai Krishna
Downloads: 125
Research Paper, Civil Engineering, India, Volume 5 Issue 4, April 2016
Pages: 526 - 530A Study on Safety Audit Management System in Kuwait
Sophiya Sunny Pulickal, Blessy B., Pratab Reddy
Downloads: 132
Research Paper, Civil Engineering, India, Volume 5 Issue 6, June 2016
Pages: 332 - 335Multiple Resource Leveling using Re-Modified Minimum Moment Method to Construction Project
Lokendra Magendra, Sudhanshu Pathak
Downloads: 163 | Weekly Hits: ⮙1 | Monthly Hits: ⮙1
M.Tech / M.E / PhD Thesis, Civil Engineering, India, Volume 7 Issue 5, May 2018
Pages: 721 - 726Planning, Selection and Management of Labour and Equipment in Construction Industry
Sonali Uppin, Sainath Nitturkar
Downloads: 164 | Weekly Hits: ⮙1 | Monthly Hits: ⮙1
Review Papers, Civil Engineering, India, Volume 8 Issue 4, April 2019
Pages: 1439 - 1445Planning & Scheduling of Residential Building Using MS Project
S. T. Gavde, Kanase Swapnali, Mulani Apreen, Jadhav Varsha, Mane Mayuri