To Minimize Construction Cost and Time of Panvel-Karjat Suburban Corridor (Under MUTP-3A) by Implementation of Value Engineering Aspect
Rushabh. N. Jain
Abstract: Mumbai Metropolitan Region (MMR), contributing about 8 percent of India?s GDP, is home for about 22 million people. The Mumbai Metropolitan Regional Development Authority (MMRDA) anticipates the population in MMR to grow by about 42 percent to 28.4 million in 2025 and by 54 percent to 30.87 million in 2036. The Mumbai suburban railway, the main lifeline of the commuter?s flow from the suburban to the Central Business District. The Asian Infrastructure Investment Bank (AIIB) is considering providing loan assistance for double line suburban corridor between Panvel and Karjat section of 30 RKm on Central Railway under the MUTP-III Project. Since this Study state that how can we execute this corridor by utilizing the available Assets, Resources by reducing the Project Cost and Time also by 5-7 % Min to Max 10-12%, by using Value Engineering Terminology.
Keywords: Value Engineering, Construction Cost, Time, Asset Utilization, Resources, Suburban Corridor
Edition: Volume 10 Issue 5, May 2021
Pages: 1285 - 1290
DOI: https://www.doi.org/10.21275/MR21526210134
Make Sure to Disable the Pop-Up Blocker of Web Browser