International Journal of Science and Research (IJSR)

International Journal of Science and Research (IJSR)
Call for Papers | Fully Refereed | Open Access | Double Blind Peer Reviewed

ISSN: 2319-7064


Downloads: 125 | Views: 292

Research Paper | Civil Engineering | India | Volume 5 Issue 5, May 2016 | Popularity: 6.6 / 10


     

Monitoring and Controlling RCC Work in Construction Project

Nimesh Gujarati, Dr. B S Balapgol


Abstract: Construction industry is always facing schedule delays and indirectly results in cost overruns. These two problems are the results of absence of better project monitoring and controlling system in a construction firm. Good monitoring and controlling system helps to forecast the project performance at any point in execution phase. Earned value management is one of the most effective project controlling and monitoring system which compares three cost performance indicators like budgeted cost of work done, budgeted cost of work scheduled and actual cost of work done. This study helps to forecast project performance periodically and propose solutions to minimize the schedule delays. Study focuses on projects where project completion in scheduled time is constraint.


Keywords: Crashing, Fast Tracking, Re-work, Tracking, Schedule Compression, Cost Slope, Schedule Variance, Cost Variance


Edition: Volume 5 Issue 5, May 2016


Pages: 2358 - 2362



Make Sure to Disable the Pop-Up Blocker of Web Browser




Text copied to Clipboard!
Nimesh Gujarati, Dr. B S Balapgol, "Monitoring and Controlling RCC Work in Construction Project", International Journal of Science and Research (IJSR), Volume 5 Issue 5, May 2016, pp. 2358-2362, URL: https://www.ijsr.net/getabstract.php?paperid=NOV163976, DOI: https://www.doi.org/10.21275/NOV163976



Top