Multiple Resource Leveling using Re-Modified Minimum Moment Method to Construction Project
Lokendra Magendra, Sudhanshu Pathak
Abstract: A Project Manager frequently comes across two types of situations time constraints and resource constraints. A project requires resource to execute the activities. These resources include labor, equipment and materials required to complete the work. In the ideal world, resources are unlimited but in the real world they are generally not unlimited and the project team needs to level out the consumption of resource. The purpose of this paper is to apply Re-modified minimum moment method for multiple resource leveling to a construction project and resource leveling by using primavera project management software for the same project and to determine the optimum solution. The method is based on critical path method. To achieve the objective, data of construction of a residential tower is taken. It has been observed that Re-modification minimum moment gives optimum solution than primavera software.
Keywords: Resource rate, Resource Leveling, Re-Modified Minimum Moment Method, Primavera
Edition: Volume 5 Issue 6, June 2016
Pages: 332 - 335
Make Sure to Disable the Pop-Up Blocker of Web Browser