Masters Thesis | Construction Management | Indonesia | Volume 9 Issue 12, December 2020 | Popularity: 6.3 / 10


     

Risk Factor Analysis of Planning Stage of Lumpsum Hydropower EPC Project Impacted to Quality and Time Performance

Arwan Kahfi, Bambang Purwoko Kusumo Bintoro, Rosalendro Eddy Nugroho


Abstract: The hydropower EPC project as a large complex project with various types of buildings carries risks that can cause failure or decrease in construction performance, especially quality performance and time schedule performance. EPC contracts with lump sum or fixed costs, where detailed planning is carried out after signing the contract in which one package with construction, then the planning stage has risk factors that affect the quality performance and time performance. A combination of quantitative and qualitative analysis is used as a research approach. Consultation and initial confirmation carried out for determining relevant risk factors to be studied and analyzed in the research model hypothesis using Structural Equation Model (SEM) with Smart-PLS software as a quantitative approach. The research model and risk response input from experts as a qualitative approach. The initial confirmation from the expert, it is known that 6 of the 8 initial variables with 36 out of 45 indicators are considered relevant for carried a hypothetical analysis of risk factors in the planning stage that affect the quality and time performance of the project. It's known that the variables of owner's necessities and requests, the scope of work and the engineering design output have a significant direct effect on quality and time performance. The communication and coordination factors have a significant effect on quality and time performance with the mediation of the engineering design output factors.


Keywords: EPC of hydropower, risk factors, planning stage, quality performance, time performance


Edition: Volume 9 Issue 12, December 2020


Pages: 249 - 257



Make Sure to Disable the Pop-Up Blocker of Web Browser




Text copied to Clipboard!
Arwan Kahfi, Bambang Purwoko Kusumo Bintoro, Rosalendro Eddy Nugroho, "Risk Factor Analysis of Planning Stage of Lumpsum Hydropower EPC Project Impacted to Quality and Time Performance", International Journal of Science and Research (IJSR), Volume 9 Issue 12, December 2020, pp. 249-257, URL: https://www.ijsr.net/getabstract.php?paperid=SR201126170057, DOI: https://www.doi.org/10.21275/SR201126170057



Downloads: 122 | Views: 247

Construction Management, India, Volume 1 Issue 3, December 2012

Pages: 64 - 67

Integration of Business and Technology Strategy Gramin Saur Urja

Sameer Jain


Downloads: 78 | Views: 294

Construction Management, Kenya, Volume 9 Issue 6, June 2020

Pages: 968 - 976

Influence of Management Ability of Contractors on Performance of Road Construction Infrastructural Projects: Beyond Project Implementation

James Mushori, Charles Mallans Rambo, Charles Misiko Wafula


Downloads: 76 | Views: 253

Construction Management, Kenya, Volume 9 Issue 6, June 2020

Pages: 984 - 992

Combined Influence of Stakeholder Participation in Project Life Cycle Management on Catalyzing Completion of Urban Roads Transport Infrastructure Projects in Kenya

Johnson Matu, Dorothy Ndunge Kyalo, John Mbugua, Angeline Sabina Mulwa


Downloads: 74 | Views: 277

Construction Management, United States of America, Volume 13 Issue 11, November 2024

Pages: 1 - 5

Comparative Analysis of Traditional vs. Modern Estimating Methods: Pros and Cons of Different Approaches in Construction

Abhiram Reddy Anireddy