Mining Earth Moving Equipment Major Component Change-Out Approach: A Broader Perspective

Dr. Dyson Galatia


Abstract: The dynamic production budgets and the volatile metal prices in the current mining industry have stimulated and strengthened a continuous search for operating efficiency in all areas of the production process, with reliability of the earth moving equipment being one of the core aspects. Unpredicted breakdown of earth moving machine major components usually cause serious consequences such as loss of production, extra cost and deviation from mine plans. From a financial perspective, these components are one of the key cost drivers among the top Mine cost centers and success in managing them (achieving expected life cycle and operational cost) is essential in meeting maintenance and production cost (cost/ton) of the equipment. Whereas relatively small and frequent repairs largely affect availability, operational cost is directly affected by major component failure. In trying to maximize the operating efficiency of earth moving equipment, various maintenance strategies and methodologies have been tried, tested and initiated. However, the challenge in most, if not all operations, has been to find an accurate method to determine the exact expected replacement point of major components. This phenomenon has been challenging, though a number of operations engage in a time-based replaced strategy as recommended by most equipment manufacturers, replacement schedules are rarely executed as panned. The norm however, has been to draw up a calendar of parts to be replaced each year during budgeting time and scheduled intervals of replacement are set following the Original Equipment Manufacturers’ (OEM) recommendation. Nevertheless, these schedules have not conclusively determined the point at which the replacement is economically justified. This study therefore, highlights the challenges of the traditional time-based component replacement strategy and recommends an approach based on condition assessment. The data used in this study are obtained from different Mines as w


Keywords: Major Component, Reliability, Life Cycle, Condition Monitoring, Maintenance


Edition: Volume 10 Issue 3, March 2021


Pages: 1366 - 1376



Make Sure to Disable the Pop-Up Blocker of Web Browser




Text copied to Clipboard!
Dr. Dyson Galatia, "Mining Earth Moving Equipment Major Component Change-Out Approach: A Broader Perspective", International Journal of Science and Research (IJSR), Volume 10 Issue 3, March 2021, pp. 1366-1376, https://www.ijsr.net/getabstract.php?paperid=SR21316130544, DOI: https://www.doi.org/10.21275/SR21316130544



Similar Articles

Downloads: 0

Research Paper, Mining, Zambia, Volume 10 Issue 8, August 2021

Pages: 1103 - 1118

Factors Affecting Maintenance Organization and Nationalization of Maintenance Roles (Feedback): A Case of a Mining Share Company

Dr. Dyson Galatia

Share this Article

Downloads: 154 | Weekly Hits: ⮙1 | Monthly Hits: ⮙1

Research Paper, Mining, Zambia, Volume 9 Issue 7, July 2020

Pages: 279 - 294

Investing the Cause of Premature Tyre Failure of Open Pit Mine Dump Trucks: A Case of ABC Mine, Northeast Africa

Dr. Dyson Galatia PhD

Share this Article

Downloads: 172 | Weekly Hits: ⮙1 | Monthly Hits: ⮙1

Research Paper, Mining, Zambia, Volume 9 Issue 9, September 2020

Pages: 58 - 72

A Critical Investigation into the Real Cause of the Low Heavy Mining Equipment Reliability: A Case of AZ Open Pit Mine, West Africa

Dr. Dyson Galatia

Share this Article

Downloads: 183

Research Paper, Mining, Zambia, Volume 9 Issue 5, May 2020

Pages: 360 - 370

Analysis of Factors that Cause Drill Rig Breakdowns: A Case of Lubambe Copper Mine, Chililabombwe, Zambia

Dr. Dyson Galatia PhD

Share this Article

Downloads: 211

Research Paper, Mining, Zambia, Volume 9 Issue 6, June 2020

Pages: 206 - 219

Exploring Factors that Affect Reliability of Open Pit Heavy Mining Dump Trucks: A Case of Bisha Mining Share Company, Eritrea