Downloads: 8 | Views: 330 | Weekly Hits: ⮙1 | Monthly Hits: ⮙1
Informative Article | Electrical Power Engineering | United Arab Emirates | Volume 10 Issue 6, June 2021 | Popularity: 5.2 / 10
Non-Disruptive Road Crossing Methods used by DEWA for High Voltage Cables Laying in Transmission Power Projects
Syed Abdul Kareem Shajahan
Abstract: Non-Disruptive Road Crossings are of the project is to enhance the management, planning, design, construction, maintenance, and operation of all roads and related infrastructures to ensure a safe and uniform operational and structural capacity throughout the road network in Dubai. NDRC techniques that can be that ensure that the roads are not destroyed for the crossing of major waterways to a technique that can be employed in very congested utility corridors along busy highway systems as well as over longer distances employed in laying down underground crossings of Transmission Power Lines in Dubai Power Network. It reduces or eliminates damage often caused by conventional open-cut trenching methods, in turn reducing the costs.
Keywords: NDRC, HDD, DEWA
Edition: Volume 10 Issue 6, June 2021
Pages: 1090 - 1093
DOI: https://www.doi.org/10.21275/SR21613214904
Make Sure to Disable the Pop-Up Blocker of Web Browser
Similar Articles
Downloads: 0
New Innovation and Idea, Electrical Power Engineering, United Arab Emirates, Volume 11 Issue 10, October 2022
Pages: 245 - 247Sustainable Initiative - Go Green Conception Testing of High Voltage Cables
Asraf Ali Syeed, Abdul Rasheed, Maher Al Ejel
Downloads: 3 | Weekly Hits: ⮙2 | Monthly Hits: ⮙2
Informative Article, Electrical Power Engineering, United Arab Emirates, Volume 12 Issue 5, May 2023
Pages: 116 - 119Mitigating Risks and Ensuring Safety in 132kv Transmission Power Cable Projects in Dubai
Syed Abdul Kareem