Resource Scheduling of Construction Project: Case Study
Rhuta Joshi, Prof. V. Z. Patil
Abstract: Several construction activities can be managed to achieve the profit within limited funds and time. Thus project management techniques are useful in scheduling and coordinating the various resources by controlled method. Management techniques such as Critical Path Method, Program Evaluation and Review Techniques (CPM/PERT) have been successfully implemented prior to the 1970-s, in various Civil Engineering projects in the countries like USA, Canada, Australia. These techniques help management in efficient and economic use of resources for completion of project objectives with unlimited availability of resources, though it is observed that resources are limited in real project scenario. It has been observed that the project delays occur due to insufficient supply of resources. In large scale projects, preparing an accurate and workable plan is very difficult. Computer packages like MS Project and Primavera project planner are used in construction industry. Project management techniques can be used to resolve resource conflicts and also useful in minimizing the project duration within limited availability of resources to make the project profitable. The main aim of this study is to analyze the Project management techniques by scheduling various construction activities, allocation of resources and resource levelling using Microsoft Project 2013 for residential building. This paper analyzes resource constrained project using Microsoft Project 2013 by resource levelling and compares the time cost implications with scheduled time and estimated cost.
Keywords: Project management, Resource scheduling, Resource leveling, Microsoft Project
Edition: Volume 4 Issue 5, May 2015
Pages: 563 - 568
Make Sure to Disable the Pop-Up Blocker of Web Browser
Similar Articles
Downloads: 8 | Weekly Hits: ⮙1 | Monthly Hits: ⮙1
Case Studies, Civil Engineering, India, Volume 11 Issue 4, April 2022
Pages: 1187 - 1197A Case Study on Planning and Scheduling of a Project PIPLMC of a Package - 6A using Microsoft Project 2016
Kota Sai Krishna
Downloads: 132
Research Paper, Civil Engineering, India, Volume 5 Issue 6, June 2016
Pages: 332 - 335Multiple Resource Leveling using Re-Modified Minimum Moment Method to Construction Project
Lokendra Magendra, Sudhanshu Pathak
Downloads: 164 | Weekly Hits: ⮙1 | Monthly Hits: ⮙1
Review Papers, Civil Engineering, India, Volume 8 Issue 4, April 2019
Pages: 1439 - 1445Planning & Scheduling of Residential Building Using MS Project
S. T. Gavde, Kanase Swapnali, Mulani Apreen, Jadhav Varsha, Mane Mayuri
Downloads: 178
M.Tech / M.E / PhD Thesis, Civil Engineering, India, Volume 8 Issue 4, April 2019
Pages: 496 - 499Effective Resource Utilization for Successful Completion of a Project in Nepal
Sudesh K.C., S. Priscil Nidhu