Found about 3 results
Downloads: 203
M.Tech / M.E / PhD Thesis, Civil Engineering, Indonesia, Volume 9 Issue 7, July 2020
7 - 12Supply Chain Risk Management Material, Equipment and HR Construction of Quality Bendon Road Pavement Works with Buton Asphalt in the Large Implementation of VI National Street of Jakarta
Abu Sofyan | Dr. Ir. Fitri Suryani MT [3] | Dr. Ir. Hari Nugraha Nurjaman MT [2]
Downloads: 184
Research Paper, Civil Engineering, Indonesia, Volume 7 Issue 12, December 2018
417 - 422Risk Management Maturity Safety and Health Management System (SMK3) Contractor-Case Study: Toll Road Project Bogor-Ciawi-Sukabumi
Susilawati [5] | Dr. Ir. Fitri Suryani MT [3] | Dr. Ir. Dwi Dinariana MT
Downloads: 98
M.Tech / M.E / PhD Thesis, Civil Engineering, Indonesia, Volume 9 Issue 7, July 2020
476 - 481Financing Projects of Road Improvement Special Economic Areas Tanjung Lesung Banten with the SBSN Scheme (Surat Berharga Syariah Negara). Case Study: Preservation and Widening of the Road to Pasauran Section - Sp Labuhan - Cibaliung and Citeureup - Tanjung Lesung
Heriyanto [3] | Dr. Ir. Hari Nugraha Nurjaman MT [2] | Dr. Ir. Fitri Suryani MT [3]