Research Paper | Mining | Congo | Volume 8 Issue 5, May 2019 | Popularity: 7.1 / 10
Optimization of the Ventilation Circuit under Ventsim Software 4.8.6.1: Application to the Kinsenda Underground Mine
Mbuya Mukombo Jr., Maneno Kanyanduru E., Ngoy Kisumpa M., Bokwala Bonkeka F.
Abstract: The study includes the estimation of the need for fresh air, the determination of the optimal design, the numerical simulation of the ventilation parameters of the project. The first step, the air requirement estimate, was based on data on the category of gear used in the mine. Using the Turgis mining consultant standard, this estimate gave a flow rate of 325 m3 / s. The second step consisted of a strategic analysis on the one hand and an optimization of the ventilation circuit on the other hand, in order to detect a technically feasible and faster strategy for carrying out this optimization. As a result, the numerical method of optimization selected airway graph optimization has been adopted. This method not only optimizes the ventilation circuit, but also gives a graph that represents the point of intersection of the different ventilation costs (cost of acquisition of fan, cost of consumption of electrical energy as well as operating costs) based on the airflow required by the Kinsenda mine. An optimal diameter of 5 meters is then obtained after optimization of the new well. Finally, the study focused on the simulation of ventilation parameters using the Ventsim 4.8.6.1 software, after which the dynamic simulation showed us that after 32 minutes when we assume that all the size fronts were mined at same time; stale air is diluted and no longer poses a toxic threat to personnel.
Keywords: estimation, ventilation, flow, simulation, design
Edition: Volume 8 Issue 5, May 2019
Pages: 2180 - 2189
Make Sure to Disable the Pop-Up Blocker of Web Browser
Similar Articles
Downloads: 4 | Weekly Hits: ⮙1 | Monthly Hits: ⮙1
Masters Thesis, Mining, Zambia, Volume 11 Issue 6, June 2022
Pages: 1074 - 1081Application of Kuz Ram Model to Minimize the Drilling and Blasting Operational Cost at RP3 Lafarge Limestone Quarry
Mangozi Fundi Jules, Thomson Sinkala, Sam Kangwa, Sunday Mulenga
Downloads: 155 | Weekly Hits: ⮙1 | Monthly Hits: ⮙1
Research Paper, Mining, Zambia, Volume 9 Issue 7, July 2020
Pages: 279 - 294Investing the Cause of Premature Tyre Failure of Open Pit Mine Dump Trucks: A Case of ABC Mine, Northeast Africa
Dr. Dyson Galatia PhD
Downloads: 168
Research Paper, Mining, Congo, Volume 8 Issue 6, June 2019
Pages: 340 - 347Erection of a Waste Earthen Dike the Kipushi Valley, DR Congo
Mbuya Mukombo Jr., Mutonkole Ngomba H., Musimba Kasiya A, Ngoy Biyukaleza B.
Downloads: 183
Research Paper, Mining, Zambia, Volume 9 Issue 5, May 2020
Pages: 360 - 370Analysis of Factors that Cause Drill Rig Breakdowns: A Case of Lubambe Copper Mine, Chililabombwe, Zambia
Dr. Dyson Galatia PhD