Downloads: 5 | Views: 197 | Weekly Hits: ⮙1 | Monthly Hits: ⮙1
Masters Thesis | Civil Engineering | Indonesia | Volume 10 Issue 9, September 2021 | Popularity: 5.5 / 10
Value Engineering on Martadinata (Pamulang) Flyover Construction
Vidi Pribadi Mentari, Dwi Dinariana, dan Arman Jayady
Abstract: Currently, the government has launched an acceleration of infrastructure development for economic growth. However, the government funds are very limited, hence, cost savings and efficiency are required. Transportation infrastructure is one of the jobs that often absorb a large portion of the funds. Projects that use large funds allow budget inefficiencies to occur, therefore the implementation of Value Engineering efforts is a solution to optimize the value of benefits while reducing unnecessary costs. Value Engineering is a systematic organized business, with a product or service function identification technique that aims to fulfill the required function at the lowest (most economical) price and Life Cycle Cost is the process of determining the sum of all costs associated with an asset or part of an asset, including acquisition, installation, operation, maintenance, renewal and removal costs. The application of Value Engineering is expected to produce optimum value in terms of quality, technology, efficiency and project innovation. This research was conducted to determine the best alternative in implementing Value Engineering and to find out the cost savings obtained from the application of Value Engineering. In this study, an analysis of two alternatives will be carried out, there are. I. combination of PCU girder with corrugated steel and foam mortar light deposit, and II corrugated steel and light heap of foam mortar. The method used is the value engineering analysis of the two alternatives. In the value engineering method, there are several stages that must be carried out, there are, the information stage, the function analysis stage, the creative stage and the development stage. The results showed that from 2 (two) alternatives, the second alternative was obtained with the most economical bridge structure, while alternative I was the next alternative.
Keywords: Value Engineering, Efficiency, Savings
Edition: Volume 10 Issue 9, September 2021
Pages: 1025 - 1031
Make Sure to Disable the Pop-Up Blocker of Web Browser
Similar Articles
Downloads: 0
Student Project, Civil Engineering, India, Volume 12 Issue 4, April 2023
Pages: 1579 - 1580Cost and Time Saving Building Construction Using RC CAD Software
Rushabh Ranjeet Patil
Downloads: 1
Research Paper, Civil Engineering, India, Volume 3 Issue 9, September 2014
Pages: 2067 - 2069Adsorption of Fluoride from Aqueous Phase by Agro Based Adsorbent
G. Anusha, J. Raja Murugadoss
Downloads: 1
Masters Thesis, Civil Engineering, Indonesia, Volume 10 Issue 9, September 2021
Pages: 907 - 917Construction Value Engineering Construction of Serang - Panimbang Toll Road Section 3, Cileles - Panimbang Sta.50+677 - Sta.83+677 Banten Province
Okto Ferry Silitonga, Dr. Ir. Dwi Dina Riana, Dr. Ir. Hari Nugraha Nurjaman
Downloads: 1
Research Paper, Civil Engineering, Libya, Volume 10 Issue 10, October 2021
Pages: 350 - 355Deterrent to Pedestrian Used More Extensively as Travel Mode in Misurata
Abdallah. N. Kamba
Downloads: 1 | Weekly Hits: ⮙1 | Monthly Hits: ⮙1
Review Papers, Civil Engineering, India, Volume 12 Issue 1, January 2023
Pages: 855 - 859A Review on Automation and Robotic Technology in Construction Industry
Muffakham Shareef