International Journal of Science and Research (IJSR)

International Journal of Science and Research (IJSR)
Call for Papers | Fully Refereed | Open Access | Double Blind Peer Reviewed

ISSN: 2319-7064


Downloads: 177 | Views: 412 | Weekly Hits: ⮙1 | Monthly Hits: ⮙1

Research Paper | Civil Engineering | India | Volume 4 Issue 8, August 2015 | Popularity: 6.5 / 10


     

Time and Cost Planning in Construction Project

Sandip Pawar, P. M. Attarde


Abstract: The project management technique of planning and scheduling using tools and devices are helpful in comparing the project with stipulated cost, time and quality. Resource tracking, Minimize the uncertainty and Cost Effectiveness is focused in this project. The software tool used for planning and scheduling is Primavera project planner enterprise for construction. The study covers three case studies of the process of planning, scheduling the activities and monitoring. A general re sequencing model had been proposed to overcome the delay factor from the critical area, to minimize the delay of the construction and to reduce the time, cost and it also helpful to concentrate on the major areas in the project. Re sequencing model leads the management to cost savings and make entire project success. Resource planning is one aspect, which decides the systematic execution of the project at worksite. This study is to have hands- on experience in an ongoing project, and evaluation of schedule of equipment, staff, Labor and Materials. It helps to plan and evaluate the resources for the Construction of the building project. This study also compares the cost variation due to the delay of the project and re scheduling the project by crashing process.


Keywords: cost, time


Edition: Volume 4 Issue 8, August 2015


Pages: 422 - 425



Make Sure to Disable the Pop-Up Blocker of Web Browser




Text copied to Clipboard!
Sandip Pawar, P. M. Attarde, "Time and Cost Planning in Construction Project", International Journal of Science and Research (IJSR), Volume 4 Issue 8, August 2015, pp. 422-425, https://www.ijsr.net/getabstract.php?paperid=SUB157277, DOI: https://www.doi.org/10.21275/SUB157277



Similar Articles

Downloads: 121

Research Paper, Civil Engineering, Iraq, Volume 6 Issue 5, May 2017

Pages: 1150 - 1157

Response of Laced Reinforced Concrete Beams to Fatigue Loading

Hayfaa Dhumad Hasan Al-Abboodi, Abass Abdulmajeed Allawi, Chai Hwa Kian

Share this Article

Downloads: 147 | Weekly Hits: ⮙1 | Monthly Hits: ⮙1

Research Paper, Civil Engineering, Iraq, Volume 4 Issue 4, April 2015

Pages: 202 - 209

Wave Transit Time in Polymer-Mortar Composites

Msc. Eng. Yasir Mohammed Abdulateef Al Bayati, Asst. Prof. Dr. Besma Mohammed Fahad

Share this Article

Downloads: 114

Research Paper, Civil Engineering, Iraq, Volume 6 Issue 4, April 2017

Pages: 2398 - 2405

Experimental Behavior of Laced Reinforced Concrete Beams under Static Loading

Hayfaa Dhumad Hasan Al-Abboodi, Abass Abdulmajeed Allawi, Chai Hwa Kian

Share this Article

Downloads: 265 | Weekly Hits: ⮙1 | Monthly Hits: ⮙1

Research Paper, Civil Engineering, India, Volume 9 Issue 6, June 2020

Pages: 954 - 955

Bamboo as a Building Material in North East of India

Nafisa Nazneen Choudhury

Share this Article

Downloads: 130 | Monthly Hits: ⮙1

M.Tech / M.E / PhD Thesis, Civil Engineering, India, Volume 8 Issue 5, May 2019

Pages: 784 - 786

Analysis of Visual Impairment for Designing a Revival Center

Vishnu R, Fazil P

Share this Article
Top